Emil Bach & Driveway. (note blue dumpster in the backyard, not part of FLW's vision)
           Currently there is scaffolding set in anticipation of concrete work to be done on the inner driveway and the front of the house. The driveway gate opens mechanically and slides to the right to open. Every single window in the front is meticulously boarded up. To the left of the house you can see daylight in those small vertical windows on either side of the door that leads to the yard, which is really a gate. Gas meter dangling and electrical hook-ups hanging bare by the concrete. A porch, stairs or ramp about to be poured as well.


The historical green plaque
 is on the pedestal to the bottom left.