A lot of activity at our local Frank Llloyd Wright house of late. One would assume that the exterior brick work in the areas covered in housewrap (olefin, high-density polyethylene fibers) was in such poor shape that they had to be completely redone. The concrete front path is about to be repoured, it is staked off with wooden planks. Work is being done to the ground wall by the path as well. These pictures are from this past Saturday. Not a peep from the Emil Bach blog, last entry was from April 23rd.
Please continue reading for more pictures
2 comments:
the redbud I planted outside on the parkway survived. Yay. Fyi, the tyvek on the second floor is going to be covered with stucco, not brick - brick is on the lower floors only.
Thanks for the info F.O.B.
Post a Comment